Laserfiche WebLink
Truck/Loader Team Work cont'd Task # : old <br />Loading Tool Cvcle Tlme : Number of loading tool passes required to fill truck : 74 <br />Excavators and front shovels -machine cycle time vs. job condition rating : BELOW AVERAGE <br />-selected value within basic rating : AVERAGE <br />Track loaders - matedal descr.: NA <br />-cycle time elements (min.) : Load : NA <br />sheet 2 of 2 <br />NA Dump : 0.700 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : NA minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material: NA NA NA <br />Stockpile : NA NA NA <br />Truck ownership : NA NA NA <br />Operation : NA NA NA <br />Dump target: NA NA NA <br /> Net cycle time adjustment : NA minutes <br /> Adjusted basic cycle time : 0-367 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 4.871 minutes <br />Truck C1LC~ Time <br />Truck exchange time: 0.60 minutes........ Adjusted for site altitude : 0.67 minutes <br />Truck load time: 4.871 minutes........ Adjusted for site altitude : 5.13 minutes <br />Truck maneuver and dump time: 1.00 minutes........ Adjusted for site altitude : 1.12 minutes <br />Truck travel (haul & return) time: <br />Road condition description :Hard, smooth, stabilized, surfaced, watered, maintained <br />Haul route <br />Road <br />seg. # Haul distance Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed Travel time ` <br />(minutes) <br />1 2,500 5.00 2.00 7.00 1240 2.10 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum ro ute : Haul time " ~ 2.36 <br />1 2,500 -5.00 2.00 -3.00 3520 0.92 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• first and last segmeNS adlustetl for acceleration/deceleration HetUrn [Ime '- <br />"lime shown includes altitutle adjustment Total truck cycle time <br />Loading tool unit production : 235.05 LCY/hour...... Adjusted for job efficiency <br />Truck unit production : 160.13 LCY/hour...... Adjusted for job efficiency <br />Optimal no. trucks/loading tool : 2 trucks........... Selected no. trucks/loader <br /> Adjusted houdy truck team production <br /> Adjusted hourly single trucWloader team production <br /> Adjusted houdy multiple truckAoader team production <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time <br />Unit cost : $2.062 /LCV Total job cost <br />1. U9 <br />10.33 <br />236.60 <br />13291 <br />2 <br />265.82 <br />236.60 <br />236.60 <br />775.53 <br />S378.396 <br />ninutes <br />minutes <br />minutes <br />LCV/hour <br />LCY/hour <br />trucks <br />LCY/hr <br />LCYfhr <br />LCY/hr <br />Hours <br />