My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-09_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2002-07-09_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 10:17:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
7/9/2002
Doc Name
Financial Warranty Increase/Cost Estimate PART 1
From
DMG
To
Climax Molybdenum Company
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EstimatingSoltware <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 28-Jun-2002 <br />User: ESC <br />Task <br />Permit or job no. <br />Abbreviation <br />Filename <br />M-1977-342 <br />none <br />M342-000 <br />Agency or organization name : DMG <br />Permit or job action :Reevaluate Amount of Required Bond <br />Task description :Summary (Tasks 16d-ZZe) <br />000 <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />16d -Revegetate Tailing Line/Powerline; tree & shrub transplants revege 1 8.0 $16,707 <br />i6e -Maintenance Ferterlize Tailing Line/Powerline; 3X revege 1 24.0 $5,886 <br />i6f -BUfferAreaRec/amation NA 1 1.0 $3,159 <br /> <br />17a -Maintenance Ferterlize East Branch Flood Bypass; 3X revege 1 24.0 $1,081 <br /> <br />18a -Tailing Building/Road Area; Structural Demolition demolish 1 100.0 $39,614 <br />18b -Backfill & Grade Tailing Building/Road Area dozer 1 156.3 $22,430 <br />18c -Revegetate Tailing Building/Road Area; Drill Seed revege i 20.0 $Y 1,492 <br />18d -Revegetate Tailing Building/Road Area; tree & shrub transplants revege 1 20.0 $23,389 <br />18e -Maintenance Ferterlize Tailing Building/Road Area; 1X revege 1 8.0 $1,012 <br />181 -BUfferArea Reclamation NA 1 1.0 $41,067 <br /> <br />19a -Backfill & Grade Mill Water Return Line/Powerline dozer 1 75.0 $10,761 <br />196 -Rip access road associated w/Mill Water Retum Line/Powerline ripper 1 33.61 $5,181 <br />19c -Revegetate Mill Water Return Line/Powerline; Drill Seed revege 1 20.0 $13,954 <br />19d -Revegetate Mill Water Return Line/Powerline; tree & shrub transplants revege 1 20.0 $28,401 <br />19e -Maintenance Ferterlize Mill Water Return Line/Powerline; iX revege 1 8.0 $2,241 <br />19f -Buffer Area Reclamation NA 1 1.0 $7,371 <br /> <br />20a -Ute Park Pumphouse,' Structural Demolition demolish 7 100.0 $55.547 <br />20b -Backfill & Grade Seep Water CanaUPump House Area dozer 2 125.6 $36,049 <br />20c -Replace 12" Topsoil on Seep Water Canal/Pump House Area scraped 1 29.7 $20,677 <br />20d -Revegetate Seep Water Canal/Pump House Area; Drill Seed revege 1 20.0 $12,312 <br />20e -Revegetate Seep Water Cana!/Pump House; tree & shrub transplants revege 1 20.0 $25,060 <br />20f -Maintenance Ferterlize Seep Water Canal/Pump House; 3X revege 1 24.0 $1,802 <br />ZOg -Buffer Area Reclamation NA 1 1.0 $3,159 <br /> <br />21a -Rip Topsoil Stockpile Area/Roads ripper 2 54.5 $16,812 <br />21b -Revegetate Topsoil Stockpile Area/Roads revege 1 30.0 $41,042 <br />21c -Revegetate Topsoil Stockpile Area/Roads; tree & shrub transplants revege 1 30.0 $83,533 <br />21 d -Maintenance Ferterlize Topsoil Stockpile Area/Roads; 3X revege 1 24.0 $6,006 <br />tie -Buffer Area Reclamation NA 1 1.0 $153,738 <br /> <br />22a -Backfill & Grade Spotted Doe Area dozer 1 27.9 $4,068 <br />22b -Revegetate Spotted Doe Area revege 1 20.0 $14,775 <br />22c -Revegetate Spotted Doe Area; tree & shrub transplants revege 1 20.0 $30,072 <br />22d -Maintenance Ferterlize Spotted Doe Area; 3X revege 1 24.0 $6,006 <br />22e -Buffer Area Reclamation NA 1 1.0 $25,272 <br />SUBTOTALS : 1,072.81 $769,676 <br />Site :Henderson Mine <br />State :Colorado <br />County :Grand <br />
The URL can be used to link to this page
Your browser does not support the video tag.