Laserfiche WebLink
EXHIBIT G <br />Water Information <br />~o ~~h~tK <br />The property is located in Pueblo County near the intersection of Courtney and South <br />Road. The site lies approximately one mile south east of the St. Charles River. Highway SO lies <br />approximately 2-miles north of the sire. The Bessemer Ditch is located 300 miles from the faz <br />north comer of the permit azea. <br />The proposed mining operation will be dry aggregate mining and have no impacts on the <br />hydrology or water rights of the surrounding azea. <br />There will be no impacts to the Bessemer Ditch or St. Chazles River from the mining. No active <br />irrigation ditches occur on the property. <br />The site will be dry mined, and groundwater is not expected to be exposed. Water for dust <br />control will be purchased from the City of Pueblo and trucked to the site. <br />