My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22779
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:24 PM
Creation date
11/21/2007 10:15:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
10/19/1993
Doc Name
BATTLE MTN RESOURCES INC BMRI SAN LUIS DMG PN M-88-112 RECLAIM TANK OVERFLOW LINE
From
BATTLE MTN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br />~. <br />A water sample was collected from the overflow water ponded <br />in the mill area. The Division received a split of this <br />sample. The sample was shipped to Core Laboratories for <br />cyanide (total and wad) analysis. The final analysis) report <br />showed the cyanide concentrations to be below groundwiater <br />and drinking water standards, 0.16 ppm CN-wad and 0.116 ppm <br />CN-total (see attached report). <br />Four soil samples were collected of the clay where th <br />overflow water ponded within the tailings disposal ar a. <br />Also, two soil samples were collected where the overf ow <br />water ponded in the mill area. The samples were ship ed to <br />Core Laboratories for cyanide (total and wad) analysi The <br />analysis reports will be submitted to the Division. <br />Although elevating and moving the line <br />specific to the tailings construction <br />taken additional pre-cautions against <br />the future. The reclaim line is being <br />constant i$ grade from the tank to the <br />will be maintained to allow the line t <br />Thus, reclaim water will not be able t <br />line to the mill area. Also, a polic <br />reclaim pumps while work on the reclai <br />is being performed has been establishe <br />performed on the line, the line will b <br />outer pipe couplings. <br />was a one timeievent <br />project, BMRI h s <br />similar situati ns in <br />relocated such that a <br />tailings facil ty <br />o free-drain to tails. <br />o move back up ~he <br />y of locking out the <br />m tank overflowlline <br />d. Each time w rk is <br />e walked to ins ect <br />If you have any questions, please call. <br />Sincerely, <br />f^+~~~ ~~ <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Chuck McDonald <br />Larry Newcomer <br />Mike Young <br />
The URL can be used to link to this page
Your browser does not support the video tag.