Laserfiche WebLink
iii iiii~iiiiiii~iii <br />~~ <br />BAST N <br />RESOURCES, IHC. <br />a subsidiary of ENTECH, Inc. <br />acnvcn' ~~' <br />•COmplete items 1 anNar Z for additional services. 19150 wish 10 receive the <br />•COmplele items a, 4a, end 4b. fOIIOWIng 3BrVICaa (fOr en <br />•Pdnl your name end etltlrass on ths,revaraa cl this loan eo that we cen slum this exlfa fee): <br />card t° you. <br />•Aaech This lone to the Irom of the rr~iers, or on the back If apace does noI 1. ~ Addressee's Address <br />permit. <br />• Wdte'Relum Receipt Requested' on the mallpiete below the edicts number. 2. ~ Restricted DBlivery <br />•The Relum Recelpl volt show to whom the article was delivered and the tlate <br />eetivered. Consult postmaster for fee. <br />3. Article Addressed to: 4a. Article Number <br />Mr Al b Ms. Gail Van Stavetrn <br />2007 Mapleton <br />Houston, Texas 77043 <br />Mr. AI & Ms. Gail Van Stavem <br />2007 Mapleton <br />Houston, Texas 77043 <br />Dear Mr. & Ms. Van Stavem: <br />X ~ -c <br />PS Form 3811, December 1994 <br />Via Certified Mail P 076 171 641 <br />P 076 171 641 <br />^ Registered ®Certified <br />^ Express Mail ^ Insured <br />^ Retum Receipt for Merchandise ^ COD <br />7. Date of Deliver <br />7-~~0 -~ <br />and /ee is paid) <br />requested <br />This letter is [o notify you, as an adjacent landowner, [hat Basin Resources, Inc., 14,300 Highway 12, <br />Weston Colorado 81091, the operator of Golden Eagle Mine Permit number C-S I-013, is filing for Phase <br />1 Bond release with the State of Colorado, Division of Minerals and Geology. Permit C-S1-013 was issued <br />by the Division on June 22,1994. . <br />The Golden Eagle Mine is located in Sections 20, 21, 23 & 29, T33S, R676V. A total of 59 acres of surface <br />disturbance from mining is covered by a Coal Reclamation Bond in the amount of $1,530,000. The <br />permittee is applying for and Division guidelines allow for the release of up to 60% ofthe total bond <br />amount in a Phase I Bond release. <br />,The Golden Eagle Mine ceased production on December 31, 1995. In accordance with the approved <br />reclamation plan and as required for phase one bond release, sealing of [he mine shafts was completed by <br />May 1996; removal of surface facilities, foundations and footers by November 1996; and rough and fmal <br />grading, returning the surface to approximate original contour, and establishment of drainage channels and <br />controls by January 1997. <br />Any written comments, objections or requests for a public hearing or informal conference regarding this <br />bond release application must be submitted to the Division of Minerals and Geology, 1313 Sherman Street <br />Room 215, Denver, Colorado 80203 by August 30, 1997. <br />Sincerely, <br />Ronald G. Thompson <br />Property Manager <br />