Laserfiche WebLink
submittal. As a note, the sediment fence/trap designations are meant for those situations where the <br />fence/trap is part of the hydrology designs. The proposed topsoil stockpile will need a temporary <br />fence/trap at the notch in the surrounding berm until the pile is vegetated enough to keep the <br />topsoil from leaving the stockpile site. This particular fence/trap does not need to be shown on a <br />map since it is not part ofthe design. <br />31. On Map 20, Map 21-3 and Figure 1 of Volume XI, there is a short ditch located between ditches <br />D-J3 and D-JS and which flows into culvert C-JI. This ditch is not labeled. Please revise Map 2Q <br />Map 21-3 and Figure 1 of Volume XI accordingly. <br />[n the January 3, 2007 submittal, BRL stated that this ditch is D-J4. However, D-J4 is located at <br />the outlet to culvert C-Jl. The short ditch in question, which is about 500 feet long, flows into the <br />inlet of culvert C-J1 from the west. Please label this ditch. <br />32. On Map 20 and Map 21-1, there are hvo red lines that are located near Pond K. One red line <br />depicts the half culvert that brings water from culvert C-K2 into Pond K What does the other red <br />line depict? For the sake of clarity, please add descriptive labels to these two red lines on Map 20 <br />and Map 21-1. <br />The Division has no further concerns. Maps 20 and 21-1 were revised in the January 3, 2007 <br />submittal. <br />33. On Map 2Q Map 21-1 and Figure 1 of VolumeXl, an unlabeled culvert is depicted next to culvert <br />C-Kl. What is the function of this culvert and does it need a label and designs? <br />BRL added a "preexisting culvert" label to Map 20 and Map 21-1 but still needs to add the label to <br />Figure 1. <br />34, Please add the designation fa• ditch D-J14 to Map 20 and Map 21-3. <br />The Division has no further concerns. Maps 20 and 21-3 were revised accordingly in the January <br />3, 2007 submittal. <br />35. Please revise Map No. 26, Previously Disturbed Areas, to show the disturbed area proposed in <br />TR-45. <br />The Division has no further concerns. Map 26 was revised in the January 3, 2007 submittal. <br />36. Please revise Map No. 32, Topsoil Distribution Plan, to show the topsoil storage and distribution <br />plan for the activities proposed in TR-45. <br />The Division has no further concerns. Map 32 was revised in the January 3, 2007 submittal by <br />BRL. <br />Letters From Other A¢encies <br />37. The Division has received the following adequacy comment letters from interested agencies: <br />