My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10522
DRMS
>
Back File Migration
>
Revision
>
REV10522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:49 AM
Creation date
11/21/2007 10:13:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
4/27/2004
Doc Name
Adequacy Review letter
From
DMG
To
Energy Fuels Coal Inc
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. The text on pages 2.05.3-17 through 2.05.3-20 does not flow properly. In <br />addition, Figwe 18 on page 2.05.3-20 has been replaced by a page of text. <br />Please update these pages so the text flows properly and please include the <br />required Figwe 18. <br />12. Please update pages 2.05.3-38 through 2.05.3-40 to reflect the current topsoil <br />stockpiles at both the mine site and the loadout. The current text does not <br />match reclaimed conditions at either the mine site or the loadout. <br />13. The text on pages 2.05.3-40, 2.05.3-41, 2.05.3-41a, 2.05.3-42 and 2.05.3-42Ra <br />does not properly flow. For example, page 2.05.3-40 ends with a description <br />of the refuse pile haul road and page 2.05.3-41 begins in the middle of a <br />sentence describing the side slopes of the haul road. Another example is that <br />page 2.05.3-41 ends with a description of light-use roads and page 2.05.3-41a <br />begins with more of the description of the haul road. Please update these <br />pages so the sequence of the text flows properly. <br />14. The text on page 2.05.3-58 does not logically follow that of page 2.05.3-57. <br />The page begins in the middle of a sentence. Please fix the text so that it <br />flows properly. <br />Rule 2.05.4 -Reclamation Plan <br />15. Pages 2.05.4-7a and 2.05.4-8 appear to be duplicate pages, in most respects. <br />Page 2.05.4-7a was the page most recently updated to reflect reclamation <br />activities but it is missing the beginning of the narrative on Backfilling and <br />Grading (on page 2.05.4-8). If the Backfilling and Grading text is added to <br />page 2.05.4-7a it could replace page 2.05.4-8 in its entirety (and be <br />renumbered as 2.05.4-8 so the page sequence is not off). Please make these <br />corrections. <br />Rule 4.04 - Suaport Facilities <br />16. Please update the text on page 4.04-2 to reflect all facilities that have been <br />approved for permanent retention. These include the truck tunnel, coal lab <br />building and pazking azea. <br />Determination of Bond Amount <br />17. The Division has determined the cost for reclamation at the Southfield Mine <br />to be $223,856.00. The Division currently holds a bond in the amount of <br />$380,431.00. The bond amount was determined through the phased bond <br />release process (SL-02) and, therefore cannot be decreased at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.