Laserfiche WebLink
11. The text on pages 2.05.3-17 through 2.05.3-20 does not flow properly. In <br />addition, Figwe 18 on page 2.05.3-20 has been replaced by a page of text. <br />Please update these pages so the text flows properly and please include the <br />required Figwe 18. <br />12. Please update pages 2.05.3-38 through 2.05.3-40 to reflect the current topsoil <br />stockpiles at both the mine site and the loadout. The current text does not <br />match reclaimed conditions at either the mine site or the loadout. <br />13. The text on pages 2.05.3-40, 2.05.3-41, 2.05.3-41a, 2.05.3-42 and 2.05.3-42Ra <br />does not properly flow. For example, page 2.05.3-40 ends with a description <br />of the refuse pile haul road and page 2.05.3-41 begins in the middle of a <br />sentence describing the side slopes of the haul road. Another example is that <br />page 2.05.3-41 ends with a description of light-use roads and page 2.05.3-41a <br />begins with more of the description of the haul road. Please update these <br />pages so the sequence of the text flows properly. <br />14. The text on page 2.05.3-58 does not logically follow that of page 2.05.3-57. <br />The page begins in the middle of a sentence. Please fix the text so that it <br />flows properly. <br />Rule 2.05.4 -Reclamation Plan <br />15. Pages 2.05.4-7a and 2.05.4-8 appear to be duplicate pages, in most respects. <br />Page 2.05.4-7a was the page most recently updated to reflect reclamation <br />activities but it is missing the beginning of the narrative on Backfilling and <br />Grading (on page 2.05.4-8). If the Backfilling and Grading text is added to <br />page 2.05.4-7a it could replace page 2.05.4-8 in its entirety (and be <br />renumbered as 2.05.4-8 so the page sequence is not off). Please make these <br />corrections. <br />Rule 4.04 - Suaport Facilities <br />16. Please update the text on page 4.04-2 to reflect all facilities that have been <br />approved for permanent retention. These include the truck tunnel, coal lab <br />building and pazking azea. <br />Determination of Bond Amount <br />17. The Division has determined the cost for reclamation at the Southfield Mine <br />to be $223,856.00. The Division currently holds a bond in the amount of <br />$380,431.00. The bond amount was determined through the phased bond <br />release process (SL-02) and, therefore cannot be decreased at this time. <br />