My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10505
DRMS
>
Back File Migration
>
Revision
>
REV10505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:16:34 AM
Creation date
11/21/2007 10:13:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Revision
Doc Date
5/15/1996
Doc Name
MARR MINE PN C-80-006 PROPOSED DECISION PERMIT RENEWAL APPLICATION 03
From
DMG
To
KERR COAL CO
Type & Sequence
RN3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF'~~~ <br />ti .• Rr <br />~`' COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />~ ~B]6 ~ <br />PROPOSED DECISION <br />for <br />Approval of Permit Renewal <br />The Colorado Division of Minerals and Geology, in accordance with C.R.S. 34-33-109(7), <br />proposes to approve the renewal of a permit to conduct surface coal mining and reclamation <br />operations at the Marr Mine, Permit No. C-80-006. <br />This decision is based on a review of the complete and accurate application and the existing <br />permit, including all conditions and revisions approved up to May 14, 1996. In accordance with <br />C.R.S. 34-33-109(7)(a), the Division makes the following determinations which warrant that the <br />permit be renewed: <br />1. The terms and conditions of the valid, existing permit are being satisfactorily met; <br />2. The present surface coal mining and reclamation operation is in compliance with all <br />requirements of the Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 <br />et seq., and the Regulations promulgated thereunder; <br />3. The renewal requested does not substantially }eopardize the permittee's continuing <br />responsibility on existing permit areas; <br />4. The operator has provided evidence that the performance bond in effect for the <br />operation will continue in full force for the proposed period of renewal as well as any <br />additional bond required; <br />5. Any additional revised or updated information as required has been provided. <br />Based on a preponderance of the evidence, the permit issued to Kerr Coal Company meets the <br />requirements under the right of successive renewal. <br />The permit application will remain a binding patt of the permit. Renewal of the permit will be <br />for a term of five (5) years. <br />I conclude that there is no basis for denying the renewal. <br />DIVISION O MINERALS AND G--EOLOGY <br />~ R <br />D' or <br />1~ 17~t~ <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.