Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources ~~~~~ <br />1 31 3 Sherman St., Room ? 15 <br />Denver, Colorado 80203 <br />Phone: 13031 866-3567 <br />FA%. 1303) 872-8106 <br />DEPARTMENT OF <br />July 23, 1997 NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />Mr. William A. Bear Jr. lames s. Lo~nhe,d <br />Bowie Resources Limited E,ecunve Director <br />Bowie No. 2 Mine Michael B. Lung <br />Division Director <br />P.O. Box 483 <br />Paonia, Colorado 81428 <br />RE: Request For Blasting Documentation, Bowie No. 2 Mine, Permit No. C-96-083, <br />Bowie Resources Limited <br />Dear Mr. Bear: <br />The Division is requesting that Bowie Resources provide certain information to the <br />Division concerning the blasting program at the Bowie No. 2 Mine. This information is <br />being requested in order to supplement the Division's investigation of a citizen's <br />complaint. That complaint was expressed to Bowie Resources by a telephone <br />conversation with David Berry of this Division. The Division requests copies of the <br />following material: <br />As required by Rule 4.08.1(3), the blaster certification for each person responsible <br />for the blasting operations at the Bowie No. 2 Mine, <br />As required by Rule 4.08.5, the complete record of each blast performed at Bowie <br />No. 2 Mine, <br />All pre-blast survey request letters, as required in Rule 4.08.2(1), that were sent to <br />"all residents or owners of dwellings or other structures located within one-half <br />mile of the permit area", along with verification that these notices were sent at <br />least 30 days before the start of any blasting, <br />4. As required in Rule 4.08.3(1)(a), the blasting schedule public notice, and <br />verification that the public notice was published in a local newspaper "at least 10 <br />days, but no more than 20 days" before blasting commenced. <br />