Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />EXHIBIT L <br />RECLAMATION COSTS <br />SOUTH FRUITA GRAVEL PIT-AMENDMENT <br />Reclamation required will include the following tasks: <br />1. Seed existing stockpile site and slopes around the existing pond-9 acres. <br />2. Topsoil and seed the two new stockpile azeas-10.5 acres. <br />3. Flatten and seed slopes on two 5 acre mining azeas. <br />The estimated reclamation costs for the above tasks are: <br />1. Replace Topsoil (Processing sites, 10.5 acres @ 6") <br />8500 C.Y. @ $1.85-------------------------$15,725.00 <br />2. Grading slopes (3760 L.F.) <br />D-7 Dozer-60 Hrs. @ $80.00-----------------------$4,800.00 <br />3. Seeding- 22.5 Acres @ $950.00---------------------------------------$21,375.00 <br />4. Mobilization-------------------------------------------------------------------$2,000.00 <br />Total $43,900.00 <br />