Laserfiche WebLink
<br />C-92-086 TR-03, adwuacv tesoonsea: Hem Rannev 5 <br />standard will be used to determine reclamation success? Please have OEI <br />submit an updated Map 5-5 clearly delineating the post-mining reclamation <br />communities and containing an appropriate map legend. Please have OEI <br />address how they will determine revegetation success now that the Mountain <br />Shrub reference area has been altered. <br />16) Typo on page 5-19, regarding topsoil depth, has been corrected as requested. <br />17) I was unable to locate a copy of map 5-3 in either the specialist permit copy <br />or the public permit copy, so I was unable to confirm if this question had <br />been addressed. The Division concurs that Table 5-3 indicates adequate <br />topsoil salvaged and retained in topsoil stockpiles. Perhaps map 5-3 was in <br />error and needs to be updated? OEI is reminded that due to the agronomic <br />nature of the post-mining land use for portions of the permit area, that care <br />needs to be taken to assure that appropriate soil type, Falfa clay loam, be <br />replaced on the cropland post-mining land use area. <br />Please have OEI assure that Map 5-3 is in agreement with Table 5-2. <br />m: \coal\share\C92080.jhb <br />cc: Dan Hernandez <br />