Laserfiche WebLink
!ASPECTION REPORT <br />ebruary 21-22, 1990 <br />-lest Elk Coal Co <br />~'0 Box 59l <br />;omerset, Colorado <br />Nt Gunnison 111 mine <br />Ground and Weather Conditions at the Mine during the Inspection: <br />Snow covered with three to six inches with melt occurring in the <br />afternoon; cool, overcast and clearing during the day <br />Personnel Present During the Inspection: <br />Dennis Conn: West Elk Coal Co <br />Kathleen Welt: West EIk Coal Co <br />Cathy Begay: Colorado Mined Land Reclamation Division (CLMRD) <br />Jeff Clap[on: CLMRD <br />Cary Fritz: OSM, Albuquerque Field Office, 11244 <br />ENFORCEMENT ACTION <br />Ten Day Notice(TDN) ll 90-02-244-1, violation 1 of l was issued to the <br />State of Colorado following this inspection because of the operators <br />failure to maintain drainage systems that divert surface water runoff <br />from the area above the fill (coal processing waste) into stabilized <br />diversion channels. There were three different areas noted during <br />the inspection that were not draining Into the diversions built <br />around the perimeter of the pile: 1. the interface between the 70 <br />foot resoiled bench berm end the waste; 2. lower section of the l00 <br />year diversion (inside bar ditch) next to [he haul road access point <br />into the active waste pile; 3. Sylvestor gulch road. <br />Page 1 <br />A new section has been opened on the upper side, immediately adjacent <br />to the existing pile of the existing waste disposal area on the lower <br />bench for additional waste disposal. During this interim the <br />operator is restricted to a relatively small area for disposal. They <br />intend to fill in the gap between the existing pile and virgin ground <br />eventually bringing the waste up level with the grade of the outer <br />pile. From there, they will bring up the whole pile on horizontal <br />lifts and put in benches at levels approved in their design. The <br />lower pile has been brought up beyond the first bench, with the outer <br />slopes on the bench graded, topsoiled and reclaimed. The top of the <br />bench, a 70 foot wide surface is graded slightly to the inside all ~ <br />the along the vidt-i~ of the bench and is then graded to drain that <br />runoff back from the center of the outer perimeter towards the <br />southern end of the pile where it is to be directed Into the 100 year <br />diversions. It has been graded to drain, resoiled with a subsoil <br />