Laserfiche WebLink
-6- <br />Location in Anoli <br />INFORMATION CATEGORY NARRATIVE MAPS <br />2.05.3(7) Coal Handling Structures pages: 3-4 <br /> no change <br />2.05.3(8) Coal Processing Waste and pages: 2-3 <br />Non-Coal processing Waste no change <br />2.05.3(9) Underground Development pages: 2-3 <br />Waste no change <br />2.05.3(10) Return of Coal Processing Pages: 2-3 <br />Waste to Abandoned no change <br />Workings <br />2.05.4 Reclamation Plan pages 1-y <br /> e `- no chan e <br />2.05.4(2)(a) Timetables page: b ~ <br />2.05.4(2)(b) Reclamation Cost Estimates rage:;y <br /> no change <br />2.05.4(2)(c) Backfilling and Grading 5 <br />3 <br />n <br />g *Post-miring <br /> e <br />chan <br />o <br />g ~_7 <br />topography - <br /> 2.05.4(2)(c) <br />2.05.4(2)(d) Topsoil (Redistribution) pages: 5-6 <br /> no change <br />2.05.4(2)(e) Revegetation pages: 6-~3 <br /> no chant e <br />2.05.4(2)(f) Disposal of Debris, Acid- Pages: 2-3 <br />Forming and Toxic-Forming no change <br />Materials <br />2.05.4(2)(g) Sealing or Managing Mine Pages: 2-3 <br />Openings, Exploration no change <br />Holes,. Other Bore holes or <br />Wells <br />2.05.5 Post-mining Land Uses Pages: 1-3 *post-mining land <br /> <br />2.05.5(1)(c) no change use - or (;-1 ~ <br /> or (2)~c) <br />2.05.6 Mitigation of the Impacts Pages: 1-zo <br />of Mining Operations n o change <br />2.05.6(1) Air Pollution Control Plan page: 1 <br /> no change <br />