My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10295
DRMS
>
Back File Migration
>
Revision
>
REV10295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:40 AM
Creation date
11/21/2007 10:10:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
2/21/1996
Doc Name
DESERADO MINE C-81-018 MR 101
From
DMG
To
DAN MATHEWS
Type & Sequence
MR101
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLD02ER (KIRK <br />Task !f: 3 Prep. by: SLB Task File Name: C018-3 <br />Date: 02/20/96 Permit #:C-81-018 Mine: Deserado Mine <br />Permit Action: mr <br />_______________________________________________ <br />Task Description: Reg rode pond <br />HOURLY EDUI PMEN7 COST <br />_____________________ Basic Machine: Cat DSL (1993) Horsepower: 335 <br /> Blade Type: SEMI-UNIVERSAL --------- <br /> Attechnent tl): ROPS Cab Shift Basis: 7/day <br /> Attachment fl2: N/A --------- <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = 538.00 N/A <br />Operating 8 overhaul cost/h r- dozer = 555.25 100 <br /> -ripper = 50.00 N/A <br />Operator cost/hr = 522.95 N/A <br />Total egp t. unit cost/hr = 5116.20 Total fleet <br />________ cost/hr: E116.20 <br /> <br />MATERIAL QUANTITIES <br />___________________ ________ <br />___________________ <br />Initial <br />Swell <br />Loose <br />Volume: 161.3 BCY <br />____________ Factor: 1.250 Volume: 207.7 LCY <br /> <br />Source of quantity ta <br />keoff: __________ _____ <br />TS N2 sediment pond map ________ <br />Source of est. swell factor: Division esti mete <br />HOURLY PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 55 ft. ------------------------- ------- <br />- ------- - Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 7807 LCY/hr Dozing method..... 1.00 (gen.) <br />- ------- - Visibility........ 7.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Conpacted fill or embankment Spoil pile factor. 0.60 (fnd-sf) <br />--------------------- ------- --------- Push gradient..... 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (pos) Altitude derati on. 7.00 (Cat tbl) <br />- -------- Materiel weight... 0.90 (Cat tbl) <br />Avg. site altitude: 5700 ft. Blade type........ 1.00 (S, SU, U) <br />Material weight 2550.00 lb/LCY Net Job Correction 0.30 <br />Mat. Desc r.: - -------- ---- ------- <br />Earth - Dry packed <br />_____________________ <br />________ <br />________ Adjusted Unit Prod.: 545.91 LCY/hr <br /> ____ <br />Adjusted Fleet Production: _______ <br />545.91 <br />LCY/hr <br />JOB COST ---- ------- <br />Fleet size 1 Dozen(s) Total Job Tine: 0.37 Hours <br />- <br />Unit Cost ------- <br />E0.213 <br />/LCY ---- <br />ToteL Job Cost: ------- <br />f42.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.