Laserfiche WebLink
D. Inco SOZ/Air Cyanide Destruction System <br />1. Process Description - Proven Technology (see <br />Attachment) <br />2. Status: - TR-010 "Inco SO2/Air Cyanide <br />Destruction System at the San Luis <br />Mine" submitted on June 16, 1992 <br />- Comment Period underway <br />- BMR has entered into a contract with <br />Inco on May 11 to use the technology <br />- BMR has entered into a contract with <br />Kilborn Engineering on May 21 to <br />design the installation <br />- BMR has selected Schmeuser <br />Associates for construction <br />- All major components with critical <br />lead times have been ordered <br />v. Conclusion <br />