My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.2.2.2 Select fill shall be placed in horizontal loose lifts and <br />compacted to a minimum of 95 percent of the <br />maximum Standard Proctor density as determined in <br />accordance with ASTM D 698. The loose lift thick- <br />ness before compaction shall not exceed 12 inches <br />for areas amenable to the use of large compaction <br />equipment. <br />10.2.2.3 The lift thickness of structural backfill after compac- <br />tion shall not exceed 6 inches. <br />10.2.2.4 The in-place moisture content of the select and <br />structural fill shall be within minus -2 percent and <br />+2 percent of the optimum. To assure maximum <br />consistency, water, as required, should be added to <br />the materials at the borrow area. <br />10.2.2.5 The Contractor shall be responsible for any damage <br />to structures caused 6y his operations in placing and <br />compacting backfill adjacent to structures. Any <br />damage to structures shall be repaired by and at the <br />expense of the Contractor. <br />10.2.2.6 Compacted backfill shall not be placed around or <br />behind the retaining walls and other cast-in-place <br />concrete structures until a minimum of 14 days has <br />elapsed from the concrete placement. Heavy equip- <br />ment shall not be permitted to operate closer than 5 <br />feet from structures for wall heights less than 8 <br />feet, and not closer than 213 the wall height for wall <br />heights between 8 feet and 10 feet. Heavy equip- <br />ment shall not be operated over encased pipelines <br />and reinforced concrete pipelines until a minimum of <br />2 feet of compacted fill has been placed and com- <br />pacted over the concrete. <br />10.2.2.7 The differential height of backfill behind opposite <br />structure walls shall not exceed 2 feet during <br />backfill operation, except at retaining walls where <br />the final grade warrants a differential height of <br />greater than 2 feet. <br />10.2.2.8 The final grade of the fill material around the perime- <br />ter of structures shall slope away from the structure <br />a minimum of 6-inches in the first 10-feet, unless <br />specified as otherwise on the Drawings. <br />SPEC. A -EARTHWORK <br />PAGE i5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.