My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10233
DRMS
>
Back File Migration
>
Revision
>
REV10233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:58 AM
Creation date
11/21/2007 10:10:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
2/12/2004
Doc Name
Barge System 2004 Construction Technical Construction Specifications
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 BORROW AREAS AND STOCKPILE AREAS <br />8.1 GENERAL <br />8.1.1 The location of borrow areas and stockpile areas, shall be as <br />designated on the Drawings, or as designated by the Owner or <br />Engineer. <br />8.1.2 The methods and equipment used by the Contractor in the excava- <br />tion of materials in the borrow areas shall be such as will produce <br />the required uniformity of mixture of each of the types of materials <br />_ at the borrow areas. <br />8.1,3 The location and extent of all borrow pits within the borrow area <br />shall be as designated by the Engineer. The Engineer reserves the <br />right to change the limits or location of the borrow pits in order to <br />obtain a more suitable mixture of earth materials, to minimize <br />stripping or for other reasons that will affect the quality of the con- <br />struction. <br />8.1.4 The final excavated surfaces of the areas shall be graded and shall <br />be left in a reasonably smooth and even condition. Borrow pit and <br />stockpile side slopes should not exceed 4H:1 V, <br />8.1.5 Waste materials should be deposited at a location to be designated <br />by the Engineer. The surface of the wasted materials should be left <br />in reasonably smooth and even conditions, with slopes generally <br />flatter than 4H:1 V. <br />8.1.6 Material to be used as select fill shall be selected from the borrow <br />areas based on its soil properties. Contractor shall use reasonable <br />attempts to separate such material at the horrow area during <br />excavation. The intent of this specification is to maximize recovery <br />of such soils with minimal double handling of the material. <br />9 EXCAVATION PROCEDURES <br />9.1 Excavation of trenches and bulk excavation and placement of fill may be <br />accomplished by any method and by use of any excavation and hauling <br />equipment suitable for the work and site, conditions. Unsuitable equipment <br />and equipment in disrepair or unable to perform the intended tasks shall <br />not be mobilized to the work site or used in the performance of the work. <br />SPEC. A -EARTHWORK <br />PAGE 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.