My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10176
DRMS
>
Back File Migration
>
Revision
>
REV10176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:17 AM
Creation date
11/21/2007 10:10:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
7/30/2001
Doc Name
YOAST MINE PN C-1994-082 PROPOSED DECISION TR 17 PROVIDES AS BUILT CERTIFICATION FOR PORTION OF HAUL
From
DMG
To
SENECA COAL CO
Type & Sequence
TR17
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III • • <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources <br />1313 Sherman St., Room 215 <br />Den.-er, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />July 30, 2001 <br />Charles McCulloh <br />Seneca Coal Company <br />P.O. Box 670 <br />Hayden, CO 81639 <br />Re: Toast Mine (Permit No. C-1994-082) <br />Proposed Decision -Technical Revision No. 17 (TR-17) <br />Provides As-Built Certification for Portion of Haul Road D <br />Dear Mr. McCulloh: <br />D~ S I O N O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MI NING•SAF ETY <br />Bill Owens <br />Governor <br />Greg E. Wakher <br />Executive DireUOr <br />Michael B. Long <br />Division Director <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 17 at the Yoast Mine. Notice of the proposed decision will be published in the Steamboat Pitot as <br />soon as possible. The first publication will initiate the ten (10) day public comment period for the <br />Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. IF the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />NJ ~i1 acP P Br~t.~ii~ <br />Michael P. Boulay <br />Environmental Protection Specialist <br />MPB/Jrc <br />Enclosure <br />cc: Cazl Johnston, Office of Surface Mining, with enclosures <br />C-TR-06 CI99a0d2 MPB 20010770_77907 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.