My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV10163
DRMS
>
Back File Migration
>
Revision
>
REV10163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:09 AM
Creation date
11/21/2007 10:10:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981014
IBM Index Class Name
Revision
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. Primary future <br />(Post-mining) <br />land use <br />(check one): <br />11. Primary resent <br />land use <br />(check one): <br />_ Cropland(CR) <br />_ Rangeland(RL) <br />Residential(RS> <br />_ Developed Water <br />_ Cropland(CR) <br />_ Rangeland(RL) <br />Residenttal(RS) <br />_ Developed Water <br />-3- <br />~ Pastureiand(PL) <br />_ Forestry(FR) <br />Recreation(RC) <br />Resources(WR) <br />_ General Agrlculture(GA) <br />_ Wildlife Habltat(WL> <br />Industrial/Commercial(IC) <br />_ Solid Waste Ofsposal(WD> <br />~ Pastureland(PL> <br />_ Forestry(FR) <br />Recreatlon(RC) <br />Resources(WR) <br />_ General Agriculture(GA) <br />_ Wildlife Habitat(WL) <br />Industrial/Commerctal(IC) <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO> <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel>. <br />Surface Mining - Front End Loader <br />13. On Site Processing: Solution (SO) Chemical (CH) _ Thermai (TH> <br />_ Heap Leach (HL) _ Vat Leach <VL) <br />14. Aopitcatlon Fee: <br />The application fee for Quarry mining is 52,325. <br />The application fee for Solution mining or any Chemical or Thermal Processing <br />is 53,100. <br />If none of these methods or processes are to be included in the operation then the <br />appllcatlon fee is E1,875. <br />The application fee for conversion to a 112 permit is 51,500. <br />112 Amendment appllcatlon fee is 51,550. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this appllcatlon and the required performance and flnanclal warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the appllcatlon has been dented. The final agency <br />action must be made within 120 calendar days from the date the appllcatlon was <br />submitted. However, the performance and flnanclal warranties must be approved by the <br />01v1s1on or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Ruse 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted•in <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations in effect at the time the <br />~':: permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.