Laserfiche WebLink
<br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: C-96-013 <br />NATURE OF VIOLATION: <br />Failure to separately remove and seeregate subsoil material: failure to remove subsoil so as to protect <br />the physical and chemical properties of the soil: failure to obtain approval prior to imolementin ag sub_ <br />soil storage Wile. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />,CT <br />SECTION(S) 34-33-111(1)(el. 34-33-120(2~(el <br />REGULATION <br />SECTION(S) 4.06.1(1), 4.06.2(5). 4.06.3(2), 2.05.3(5), 2.08.4 <br />PERMIT <br />SECTION(S) Petmit C-80-007; Section 2.05.3: Section 2.05.4; Exhibit 51 <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Lower Refuse Pile; northwest corner, east side and pile tom <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />(l) Provide a revision to Permit No. C-80-007 which addresses the justification for soil material <br />storage_procedures other than those already aaaroved; (2) Implement any approved revision; (3) Move <br />the subsoil placed at the unapproved location to an approved location, if necessary, subsequent to <br />consideration of the revision required a[ Step (11. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE July 31 1996. <br />0221 F (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />