Laserfiche WebLink
`= <br />(SC5EDL"L~ ':O ?:O. ~~__ _:' i%SOLATION) <br />Notice of Violation No. NOV 82-69 <br />NATURE OF VIOLATION <br />Failure to minimize disturbance to the hydro logic balance. The operator <br />failed to complete construction of the sediment pond below the Refuse Area <br />by the September 29, 1982 compliance date. This compliance date was set <br />forth in a letter dated 11ay 10, 1982 and in our May, 1982 inspection report. <br />.'vCT, REGULATION, OR PERMIT PROVISION(S) VIOLATED <br />acT ssczroN(s) 34-33-121(2)(1) <br />REGULATZCN SECTIOIJ (S) 4.05.1(1) <br />PERMIT SECTION(S) <br />POP.TION OF THE OPERATION TO lJHICH THIS NOTICE APPLIES <br />ThA carlimanr nnnri which collects runoff from the Refuse Pile Area (Refuse <br />STEPS NECESSARY TO ABATE VIOLATION (RE,IIEDIAL ACTION) <br />The operator shall construct the emerQencV spillway on the pond embankment <br />to the specifications in the approved desi,n. <br />TIME FOR ABATE.'NENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE January 15 19 82 <br />(Rev. ZO/B 2) <br />-3- <br />