Laserfiche WebLink
J. J. Dudash - 2 - February 23, 2004 <br />Soils <br />No detailed soil survey is available. <br />Vegetation <br />Map 3-1 Vegetation, Iron Point Tract, shows vegetation boundaries for the entire area <br />to be affected by this revision. <br />Reclamation Estimate <br />The reclamation estimate involves grading and revegetation. Grading cost is estimated <br />to be $8,400 (48 hours with a large track backhoe/excavator at a cost of $175.00 per <br />hour). Revegetation cost is estimated to be about $2,000 for a total reclamation <br />expense of $10,400. <br />T&E Species Survey <br />See Volume III, tab 9. <br />Map 9 Hydrological Monitoring Location Map is enclosed to support this technical <br />revision application: <br />Please call if you have any questions. <br />Sincerely, <br />f<~~ <br />J". E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />