My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-02_REVISION - M1977247
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977247
>
2003-04-02_REVISION - M1977247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:42:03 PM
Creation date
11/21/2007 10:09:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
Revision
Doc Date
4/2/2003
Doc Name
Estimate for Completion
From
Asurite Inc
To
DMG
Type & Sequence
SR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Azurite, Ine. ''~ <br />10001 CR 12 P.O. Box 338 <br />Cotopaxi, Colorado 81223 <br />719-942-4178 <br />Mazch 28, 2003 <br />Mr. James Dillie, Environmental Specialist /S_ ~ 3 <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street Rm 215 <br />Denver, CO 80203 <br />RE _G-P_GYPSUM PERMIT NUMBER <br />Dear Mr. Dillie, <br />RECEIVED <br />APR 011003 <br />Division of Minerals and Geology <br />77-247 ESTIMATE FOR COMPLETION <br />Please be advised that G-P Gypsum, Inc., has determined that cost for completion of the five year <br />term for final reclamation at its Coaldale mine site has been budgeted to total $141,000.00. This <br />amount will be expended at a rate of 20% of the total each yeaz for the next five yeazs to cover costs <br />to re-seed and mulch, maintain seedlings via watering, and maintain roadways, storm ditches, and <br />structures related to sediment control at the site. Should you have any questions regazding the cost <br />estimates or scope of work to be performed over the next five yeazs, do not hesitate to contact me. <br />Should you feel that a site visit is warranted to review the completion of work performed to date, or <br />to clazify the job task estimates as planned, please contact me as soon as is convenient for you. Mr. <br />Brooks would like to be present if you wish to schedule a site visit for purposes of confirming the <br />adjusted bond amount. <br />G-P Gypsum requests adjustment of the current bond amount of $457,000.00 down to an amount <br />appropriate to reflect the projected costs of final reclamation. Please advise as to the proper <br />procedure for bond amount adjustment. <br /> <br />Kenneth S. Klco <br />Consulting Geologist <br />Agent for G-P Gypsum Corporation <br />Copy: TC Brooks <br />JA Rittenhouse <br />
The URL can be used to link to this page
Your browser does not support the video tag.