Laserfiche WebLink
• iiiiiiiiiiiiiiiiiii, • <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman SI.. Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 8663567 <br />FAX: (7031 832-8106 <br />~~ <br />DIVISION OF' <br />MINERALS <br />GEOLOGY' <br />RECLAMATION <br />MINING•SAFETY <br />Bill Ovens <br />Notice of 110(cl to 112(c) Construction Materials c°ver"or <br />Greg E. Walther <br />Reclamation Permit Conversion Application Consideration Executive Director <br />Michael B. Long <br />Division Direcor <br />DATE: <br />TO: <br />FROM: <br />RE: <br />May 22, 2001 <br />Mr. Terry McKee <br />U.S. Army Corps of Engineers <br />Tri-Lakes Project Office <br />9307 S. Platte Canyon Rd. <br />Littleton, CO 80128-6901 <br />C~ <br />Carl B. Moues, Senior Environmental Protection Specialist ~~°r <br />Morgan County, Vancil Pit, Permit No. M-1979-210 <br />Please be advised that on May 21, 2001, Morgan County, whose address and telephone number are 17303 CR S, <br />Ft Morgan, CO 80701; (970) 867-9446, filesi an apphcation to convert M-1979-210, Vancil Pit, a 110(c) <br />Limited Impact Construction Materials Permit to a 112(c) Regular Construction Materials Permit. The mining <br />and reclamation operation is located at or near Section 4, Township SN, Range 56W, 6th Prime Meridian, in <br />Morgan County. The application decision is scheduled for August 20, 2001. <br />A copy ofthe application is available for review at the Morgan County Clerk & Recorder's ofl5ce and at the office <br />of the Division of Minerals and Geology, Room 215, 1313 Sherman SVeet, Denver, Colorado 80203. <br />If you desire to make comments or objections, they must be submitted within twenty (20) days of the date of the <br />newspaper public notice to be considered in the application review process by the Division. You should corrtad <br />the applicant for the newspaper publication date. If we do not receive your comments or any objection by the end <br />of the public comment period, the Office will assume you have no objection or comment to the proposed activity. <br />