Laserfiche WebLink
<br />• Operation of a concrete batch plant <br />• Scale and portable office facilities. <br />• Re-cycling of soil, asphalt and concrete rubble. <br />The post mine land use will remain unchanged as "Range Land" with re-vegetated slopes. __ <br />In order to assist with the evaluation of the requested modification, a matrix has been <br />included within the Table of Contents which identifies what exhibits contained within the <br />existing permit that have, or have not been modified. <br />