Laserfiche WebLink
<br />~ ~~ <br />oS ~~ <br />V'C ~, Ct ~ t,J <br />~~~/ <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (3031 866-3581 / <br />FAX (303) 866-3589 <br />wvvw.watecstate.co.us Response to Reclamation Petmit Application Consideration <br />DATE: November 2, 2006 <br />TO: Bob Oswald, Environmental Protection Specialist <br />CC: Division 2 Office; District 13 Water Commissioner ~C~l~~~ <br />FROM: Clay Kimmi, E.LT. / t(IV ~ .2 711f1~ <br />RE: Hardshi Lode uar File No. M-1987-027 Division o. reclamation, <br />P Q rYr `~ Miniity and Safety <br />Operator: Colorado Quarries Inc <br />Contact: Bi11 Tezak <br />Section 8, Twp 225, Rng 72W, 6th P.M., Custer County <br />oF'coto <br />~~, _. <br />~~, <br />• r <br />r <br />~ r876 Y <br />Bill Owen <br />Lovemor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br />