My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09804
DRMS
>
Back File Migration
>
Revision
>
REV09804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:10:16 AM
Creation date
11/21/2007 10:07:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
Revision
Doc Date
10/20/1999
Doc Name
VAGNEUR GRAVEL PIT AMENDMENT FN M-80-085 AM-001
From
ELAM CONSTRUCTION INC
To
DNR
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ REC~~I~Ir.:~ <br />- s - Sri 2 ~ i~99 <br />~IVI510^ r! ~,,~gr~f: g (`iBC~~-'_'i <br />.Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, <br />there aze a number of important requirements which you, as a permittee, should fully understand. These <br />requirements aze listed below. Please read and initial each requirement, in the space provided, to acknowledge <br />that you understand your obligations. If you do not understand these obligations then please contact this Office <br />for a full explanation. <br />~°~~. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume <br />legal liability for all reasonable expenses which the Boazd or the Office may incur to reclaim the affected <br />lands associated with your mining operation in the event your permit is revoked and financial warranty is <br />forfeited; <br />`~~'- 2. The Boazd may suspend or revoke this permit, or assess a civil penalty, upon a fording that the <br />permittee violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that <br />information contained in the application or your permit misrepresent important material facts; <br />_ 3. If your mining and reclamation operations affect azeas beyond the boundaries of an approved permit <br />boundary, substantial civil penalties, to you as permittee can result; <br />/~~~4. Any modification to the approved mining and reclazrtation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; . <br />_~~(/~5~. It is your responsibility to notify the Office of any changes in your addressor phone number; <br />~~~_ 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the <br />entrance of the mine site, which shall be cleazly visible from the access road, with the following information <br />(Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado <br />Mined Land Reclamation Boazd; and, <br />(~ c. the permit number. <br />~~~`_ 7. The boundaries of the pemtit boundary azea must be mazked by monuments or other markers that aze <br />cleazly vrstble and adequate to dehneate such boundaries prior to srte disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.