My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22196
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:59 PM
Creation date
11/21/2007 10:07:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
12/9/1996
Doc Name
SENECA II-W MINE PN C-82-057 NOV C-95-023
From
SENECA COAL CO
To
DMG
Violation No.
CV1995023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />III IIIIIIIIIIIII III <br />sss <br />E~~A <br />S Coal Company Seneca Coal Company <br />December 5, 1996 RF_CEIVED <br />Ms. Erica Crosby DEC 09 1996 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 ~~~~~<.~or~„,~•~~~,„~~~~.~Geoiogy <br />R8: Seneca II-W Mine Permit C-82-057, NOV C-95-023 <br />Dear Ms. Crosby: <br />This correspondence is a request for an extension of time for the <br />abatement of NOV C-95-023 to the Seneca II-w Mine Permit C-82-057. <br />The current abatement deadline for this NOV is Monday, December <br />9th. <br />Seneca has initiated the field implementation of the abatement <br />plans approved in Technical Revision No. 25. We have removed the <br />topsoil over the area which needs to be regraded. Seneca still <br />needs to get the final slope back to a 3:1, replace the topsoil and <br />revegetate the redisturbed acreage. Also some additional drainage <br />work needs to be redone. Because of the weather and ground <br />conditions over the last two months this work has not been able to <br />progress as anticipated. The ground has been wet and very muddy and <br />detrimental work has occurred each time we have had a bulldozer <br />start cutting this slope down. Mobile equipment operator safety on <br />this slope is also a concern at the present time. Unfortunately, <br />the window for topsoil replacement and revegetation activities has <br />passed us. To complete the entire abatement plans will take us into <br />the spring of 1997 when all snowmelt has taken place. I am asking <br />for a 90-day extension of the current deadline to March 9th. <br />Should you or any other members of the Division have any questions <br />regarding this information, please do not hesitate to contact me. <br />Sincerely, <br />~w~Q,9d . <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276,3707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.