Laserfiche WebLink
<br />• IV. CONCLUSIONS <br /> <br />The results of SEDCAD+ modelling show that the reclaimed azea produces less <br />sediment than the adjacent undisturbed pinyon juniper area for the design storm. The <br />computer model verifies what is expected in this case and also what has been seen at <br />other sites in Colorado. Based on the results of the sedimentology analysis, the <br />reclaimed areas at the La Plata No. 1 Mine qualify for Phase II bond release at this <br />time. <br />u <br />L J <br />_~ <br />