Laserfiche WebLink
V. Status of Problem Resolution <br />The following items concern problems identified at previous inspections. <br />Problems are classified into two categories. These are: (1) problems <br />resolved; and (2) operator delinquent. The date that the problem is resolved <br />or the date that the operator is deemed delinquent is to be clearly stated. <br />NOV C-85-004 was written during this {~anuary, 1985) inspection. <br />Abatements for this NOV were as follows: <br />1. Cease discharge from the wash plant to Pond 1 and <br />2. Provide a spill containment plan for any discharge from the wash plant if <br />needed. The abatement date for this NOV was March 1, 1985, but was extended <br />to April 1, 1985. <br />During this (April 5, 1985) inspection it was determined that the NOV had been <br />abated, and a termination notice was issued on site. <br />CO-85-032 was written during this (April 5, 1985) inspection. Abatements for <br />this CO were as follows: <br />1. Cease practices which cause all discharge from the thickener. <br />2. Reestablish proper surface drainage control on and around the raw coal <br />pile area. <br />The abatement date was April 5, 1985. The operated completed the required <br />abatements prior to the inspector leaving the mine. Therefore a Termination <br />Notice was issued on-site on April 5, 1985. <br />