Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit also are identified below. <br />CO-85-032 was written for fai]ure.to minimize disturbance to the hydrologic <br />balance. Specifically: <br />1, uncontrolled surface flow off the raw coal pile area. <br />2. Flow from the thickener tank into and through Sediment Pond No. 006 <br />continuing out the emergency spillway. <br />Abatement for this CO was to reestablish proper surface drainage control on <br />and around the raw coal pile area and to cease practices which cause all <br />discharge from the thickener by April 5, 1985. <br />The abatements were carried out while the inspector was at the mine. <br />Therefore a Termination Notice was issued on April 5, while on the mine site. <br />Addition details relating to CO 85-032 are given in Section I. <br />