SENT HY:ENERGY FUELS NUCLERR ; 5- 1-93 11:S1RM 7197844352-~ 303 832 8106;tt 5 <br /> <br />An access road, 200 feet long by 15 feet wide, will be constructed from <br />the existing mine access road to the trailer site. Due to the gently <br />sloping terrain, no cut and fill will be required. Topsoil along the road <br />corridor will be stripped to a depth of eight (8) inches and stockpiled <br />in the topsoil stockpile located dust east of the proposed road. The <br />access road will ba graded and surfaced with gravel for all weather use. <br />Also, two (2) 19-inch corrugated e~etal pipe culverts will be installed <br />across the proposed access road, as shown on Figure 1, Proposed Troller <br />Site and Access Road. Drainage t1~aa the site will flow into the existing <br />ditches along the mine access road. <br />Power will be routed underground to the trailer from an existing power <br />pole located approximately 90 feet north of the proposed trailer site as <br />shown on Figure 1, Proposed Trailer Site and Access Road. The powerline <br />will be a shielded table installed six (6) inches abovo the waterline 1n <br />the same trench. <br />A waterline will be routed underground from the guard shack to the trailer <br />as shown by Figure 1, Proposed Trailer Site and Access Road. The <br />waterline will be approximately 800 feet long and will be placed 36 inches <br />deep. <br />A septic system and leach field for the trailer will be installed on the <br />trailer site northeast of the troller according to county regulations. <br />The proposed trailer site and access road will be graded periodically and <br />the culverts will be kept open year-round. <br />The troller 1s expected to remain on the site for the life of the mine. <br />®~ Upon completion of mining the trailer and trailer supports will be <br />- reexared. <br />3 <br />