My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22072
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:53 PM
Creation date
11/21/2007 10:05:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
7/28/1995
Doc Name
NOV C-95-021 FN C-81-041
From
POWDERHORN COAL CO
To
DMG
Violation No.
CV1995021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POWDERHORN <br />COAL COMPANY <br />July 28, 1995 <br />Mr. Dan Mathews <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />2148 Broadway, #C-5 <br />Grand Junction, CO 81503 <br />RE: Notice of Violation C-95-021, File C-81-041 <br />Dear Mr. Mathews: <br />999 <br />P.O. Bo% 1430 <br />Palisade, Colorado 61526 <br />(303) 464-7951 <br />Fax (303) 4647181 <br />In response to the final abatement requirements of the subject <br />NOV, certification is being submitted to verify implementation of <br />water treatment system modifications as set forth in our July 13, <br />1995, remedial action plan. As stated in the plan the major <br />problem was that the pump at the portal was malfunctioning and <br />not able to stay ahead of the pump supplying it. This pump was <br />repaired during the week following the violation. The second <br />item listed in the plan was to install a pipeline from the No. 1 <br />East Mains seals to the sump at the north end of the No. 1 North <br />Mains. Dewatering the sealed area at a uniform rate will reduce <br />the chances of overloading the pump that feeds the portal sump <br />and will thereby reduce the chance of overloading the portal <br />sump. This pipeline was completed this morning. <br />I hereby certify that the pump was repaired and the water line <br />wa:, 1;1Stulled as 3e : rlYicd in the remedial action Yian submitted <br />to you dated July 13, 1995. <br />Please let me know if you have any further questions. <br />Sincer , <br />~~~ <br />..... ~ ~ / <br />Larry ~ Reschke, PE <br />Engineer <br />LMR:lmr <br />cc: Dick Reisinger(WACC) <br />MATH728 <br />~; . <br />
The URL can be used to link to this page
Your browser does not support the video tag.