My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22044
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:52 PM
Creation date
11/21/2007 10:05:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
3/2/2005
Doc Name
Extension Request for NOV Response
From
Colowyo Coal Company L.P.
To
DMG
Violation No.
CV2004001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
//~ Kennecott <br />~ .. Energy <br />Colowyo Coal Mine <br />5731 Stave Hiyhvsy 13 <br />Mezhzr. Colorado e t 64 t <br />Telephone. (990)82a-1532 <br />Fax- (970)B2C-1698 <br />C. Cfellln SCOII <br />Sr. Ervironmental Engineer <br />February 28, 2005 <br />Mr. Byron G. Walker, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />(303)866-3567 <br />REGEIVED <br />MAR 0 2 2005 <br />Oirision ~f Minerels and Geology <br />RE: Request for Extension on Response to NOY No. CV-2004-001, from Colowyo Coal Mine, <br />Permit No. C-81-019 <br />Dear Mr. Walker, <br />In response to Colowyo's NOV (No. CV-2004-001), abatement Item 3b of the notice, Colowyo respectfully <br />request an extension of 90 days to allow for the BLM to continue their review of the Lease Modification <br />request, dated August 18, 2004. <br />To date Colowyo has submitted a Lease Modification Application to the BLM and copied CDMG. Since <br />then BLM has completed their Environmental Assessment and are working on the engineering and <br />reserve estimate for the modified lease. BLM is in progress of hiring a new Mine Engineer in the Craig, <br />Colorado field office, therefore they are waiting for his arrival to involve that individual in the process. As <br />soon as BLM approves that application Colowyo will submit a TR or PR as needed to update their mining <br />permit. <br />Therefore, due to the steps required to acquire the necessary information for the application, Colowyo <br />requests a 90 day extension as per the Colorado Mining Rules and Regulations regarding abatement. If <br />you have any questions regarding this matter please call me. Thank you for your time and attention to <br />this matter. <br />Sincerely, <br />~/~ <br />C. Crellin Scott <br /> <br />Sr. Environmental Engineer <br />Cc: File: CF 17.6.4 NOV-2004-001 <br />Bob Young <br />Kelly Sanders <br />Dan Hernandez <br />AntelaFe Mira • rotowyo Mire • Cortlero Rojo AAure • Jxdss Aanch Mtne • 5{xing Creel Mine <br />A member of the Rio Tinto Gtoup <br />
The URL can be used to link to this page
Your browser does not support the video tag.