My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22036
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:52 PM
Creation date
11/21/2007 10:05:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
9/11/1992
Doc Name
STATUS OF NOV C-92-013 C-92-014 C-92-020 AND C-92-021 TRINIDAD BASIN MINES PN C-81-048
From
DMG
To
GREG LEWICKI AND ASSOCIATES
Violation No.
CV1992021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman Sl., Room 215 <br />Denver, CO 80203 <br />Phone:13031866-3567 <br />FAx: (303)032-8106 <br />STATE OF COLORADO <br />pv oao <br />ti~ ~ <br />.~~~/ <br />re~c • ! <br />SETTLEMENT AGREEMENT <br />Roy Romer <br />Governor <br />Michael B. LOng <br />Division Direoror <br />Cessation Order No. <br />Notice of Violation No. C-92-020 <br />Mine Name: Trinidad Basin Mine Permit No.: C-81-048 <br />Permittee: Trinidad Basin Mining Company <br />Mailing Address: Mr. Vance Mills; HC-81, P.0. Box 6; Barbourville, KY 40906 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Las Animas Type of Mine: Surface/Private <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be 3 750.00 <br />2. The penalty shall be paid to the Division by the operator nct later <br />than 30 days from the date hereof; <br />?. Payment of such penalty by the operator shall con5tltute a ~.vaiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not 5o signed, the <br />Division will fix the penalty at ~..hatever amount it deems appropriat=, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(4). <br />DATE: <br />DA T_: September 'l, 1992 <br />Penalty Adjustmenr Reviewed <br />CRule 5.04.3(s)(c)7 <br />C.R.S. 3a-33-123(8)(c)(d> <br />(Rev. 5/85) <br />OPERATOR <br />By <br />DP/iSION GF MINED LAND. RECLAMATION <br />By _ ~--.~~~'-- <br />IConference Officer <br />,,, <br />~J <br />Division Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.