My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE22032
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE22032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:52 PM
Creation date
11/21/2007 10:05:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
6/1/1994
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
identification, mining plan contingencies, and spoil/mine soil reconstruction <br />plans (respectively) that address acid or toxic spoil horizons. <br />C. Ground and Surface Water Monitoring <br />1. The applicant will conduct monitoring of ground water in a manner approved <br />by the Division (4.05.13(1)). The ground water monitoring plan is as <br />follows: <br />a. The baseline data gathering program (New Horizon 2 -July 1986 to July <br />1987) took monthly static water levels and quarterly water quality <br />samples in January, April, July and October. Results are discussed and <br />tabulated in Appendix 3 of the permit application. <br />b. All wells in the New Horizon 1 area will be monitored on a monthly <br />basis for water levels and adjusted to MSL. Water Quality parameters <br />will be collected and analyzed on asemi-annual basis. <br />All wells in the New Horizon Mine 2 are will be monitored monthly for <br />water levels adjusted to MSL and samples will be collected quarterly for <br />water quality parameters with the exception of wells 13, 14 and 15 <br />which will be on a semi-annual basis. <br />c. Three springs are being monitored at New Horizon 1, two spoils and <br />one highwall. Monthly measurements of field water quality parameters <br />and semi-annual full suite water quality samples are taken. No springs <br />or seeps have been discovered at New Horizon 2. <br />2. The applicant will conduct monitoring of surface water in a manner approved <br />by the Division. The monitoring plan was submitted under 2.05.6(3)(b)(iii) <br />and includes the following: (4.05.13(2)) <br />a. The baseline program (New Horizon 2 -July 1986 to July 1987) <br />included monthly visits to maintain, service, take flow measurements, <br />take field parameters and collect full suite water quality samples. <br />Results of this program are discussed and tabulated in Appendix 3 of the <br />New Horizon 2 permit application. <br />b. The current monitoring program will consist of monthly field parameters <br />and quarterly full suite water quality samples. <br />c. NPDES sites (sediment pond outlets) will have monthly maintenance, <br />service, flow measurements, field parameters and quarterly full suite <br />water quality samples. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.