Laserfiche WebLink
RECLAMAS ION COST SUMMARY cont'd <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT 4 SPECIAL HANDLING <br />Task q~ Task Desc rip[ion <br />0 <br />53 ~ move topsoil stockpile off portal 9 berm <br />54 ~ topsoil on portal 9 re Euse area <br />55 ~ NW topsoil on ce Euse area <br />56 ~ NE topsoil on refuse area <br />57 ~ topsoil from b9 Co refuse area <br />58 ~ topsoil on portal 5 facilities area <br />59 ~ overburden material at SA portal <br />60 ~ topsoil at Portal 9 facilities area <br />61 ~ topsoil a[ old Shop <br />62 ~ topsoil aC N. angle 7 area <br />63 ~ topsoil on access road to q5 dewatez hole <br />64 ~ Topsoil access road <br />69b ~ Topsoil main substation and road <br />79 ~ Sops oil on Amoco pond <br />~ Cost ($) <br />$19,565 <br />$3,079 <br />~ $5,876 <br />Sl, B7B <br />5270 <br />$12,296 <br />$8,078 <br />$22,381 <br />5520 <br />~ 5157 <br />5136 <br />5728 <br />5159 <br />$SS <br />Subtotal IJ): 576,737 <br />sheet 6 of 10 <br />