Laserfiche WebLink
RECLAMATION COST SV<•A1MY coned <br />70TAL DIRECT RECLAMATION COSTS (subtotals A through P): 52,969,565 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD fi PROFIT <br />Item k~ <br />______ Item Description <br />__________________________________ <br />___________ ~ <br />_ <br />_______ Cost (5) <br />___________ <br />I <br />1. ~ Public Liability Insurance..... 1.5601 of I <br />di recce 546,029 <br />2. ~ . GOnC ra ct or's Per Eormance Bond.. 0.8604 of direccl 525,578 <br />3. ~ Con[ractor's Profit............ 10.004 of direcc,I 5296,959 <br />9. I Job Superintendent.. I 552,669 <br /> Subtot al IA1: 5921,195 <br />TOT AL CCNSTRUCT:ON CONTRACT AMOUNT ld irect plus O fi P1: 53,]90,760 <br />B . DMG PROTECT ADMINISTRATION EXPENSES <br />Item <br />____ k~ Item Description <br />__I_______________________________________ ~ <br />_____________I Cost (5) <br />___________ <br />1 . ~ Project engineering fee9 aC.... 9. 29! of cnt r. ~ $194,108 <br />2 <br />____ . ~ Adm. exp.= 624 hours at 2BE 1. <br />__________________________________________ 004per hour ~ <br />______________ 517,790 <br />___________ <br /> Subtotal (B1~ $161,895 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 5557,097 <br />NET INDIRECT COST PERCENTAGE: 19.64! <br />TOTAL PERFORMANCE BOND AMOUNT (DIRECT plus INDIRECT costsl: 57,552,679 <br />III. BOND STATUS -- BOND RELEASE SUMMARY <br />Tovn Loatlout: Phases I, II, fi III granted 2/21/90 <br />515,392 <br />sheet 10 of l0 <br />