Laserfiche WebLink
List of Stipulations Resulting from this Permit Revision Approval: <br />Stipulation No. 8: <br />WITHIN 60 DAYS OF APPROVAL OF PERMIT REVISION 03, NATIONAL KING COAL WILL <br />SUBMIT A PLAN IN THE FORM OF A TECHNICAL REVISION TO THE PERMIT THAT <br />SHALL INCLUDE CHANGES TO THE PRIMARY AND EMERGENCY SPILLWAYS OF EACH POND <br />AND INCORPORATE ROUTING CHANGES TO THE EAST DRAINAGE DITCH. THE PLAN <br />SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 4.05.4, 4.05.5, <br />4.05.6, 4.05.7, AND 4.05.9. <br />Stipulation No. 9: <br />WITHIN 60 DAYS OF APPROVAL OF PERMIT REVISION 03, NATIONAL KING COAL WILL <br />SUBMIT IN THE FORM OF A MINOR REVISION TO THE PERMIT A FINAL RECLAMATION <br />PHASE SEED MIXTURE WHICH INCLUDES BOTH WARM AND COOL SEASON GRASSES. THE <br />MIXTURE SHALL COMPLY WITH THE APPLICABLE PORTIONS OF RULES 4.15.2 AND <br />4.15.8. <br />/ern <br />2785G <br />