My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09497
DRMS
>
Back File Migration
>
Revision
>
REV09497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:59 AM
Creation date
11/21/2007 10:04:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987171
IBM Index Class Name
Revision
Doc Date
6/23/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> C I R C E $ Cost Es Cimating Software <br /> EARTHWORK FORM - BULLD02ER RIPPING <br />Agency or organization name DMG <br />Task p 002 State Colorado Permit # M-8]-171 <br />Da [e 06/23/99 County E1 Paso Abbr. none <br />User JD1 Site Fountain Pic Filename M171-002 <br />_____________ ___________________ _______________________ <br />Permit/job action Phased Reclamation <br />Task description Rip Disturbed Area <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST Basic machine Cat DBN 11996) Horsepower 285 <br />Blade type Universal " " """"" <br />Attachment #1 RO PS Cab Shift basis: 1/day <br />Attachment #2 3-shank ripper " "'_""' <br />Utilization E (CRG) <br />Cost/Hour Breakdown Ownership $/hour 593.26 NA <br />'-----""" Operating 5/hour 555.21 100 <br />Ripper op.5/hour 57.00 100 <br />Operator 5/hour 523.12 NA <br />Total unit 5/hour: $128.58 Total fleet cost/hr 5128.58 <br />MATERIAL QUANTITIES <br />___________ __________ Selected method Area <br />Seismic Load Bank " " " " " "' <br />method NA NA factor NA volume NA BCY <br />Area ___ __________ _ _________ ____ <br />method 35.00 Acres Rip depth: 1.00 volume 56,46] BCY or CCY <br />Source of guan Ci ty Cake-off Program <br />SOn [Ce OE mdC. 10dd fdCCOI NA <br />HOURLY PRODUCTION <br />Seismic Method Material sei zmic velocity NA feet/sec. <br /> Unadjusted hourly prod. NA BCY or CCY/hr <br />Area Method Avg. rip depth per pass 1. 00 fee[ <br />"""""" Avg. rip width per pass 7. OB fee[ <br /> Avg. rip length per pass 500. 00 feet <br /> Avg. velocity of machine 88. 00 Eee[/min. <br /> Avg. machine maneuver time: 0. 25 minutes <br /> Hourly prod. per unit area: 0.622 acres/hr <br /> Unadjusted hourly prod. 1,326. 18 BCY or CCY/hr <br />Correction Factors Unadjusted production 1,326.18 BCY or CCY/hr <br />" " """"'--"----' Site altitude 5,600 feet <br />Altitude adj us[men[ 1.00 (GAT HB) <br />Job efficiency factor 0.83 (lsh/dayl <br />Net job correction O.B3 multiplier <br />Adjusted hourly production: 1,100.73 BCY or CCY/hr <br />Ada us ted fleet production 1,100.73 eCY or CCY/hr <br />JOB COST =_________ <br />Flee[ size 1 Do zer (sl Total job time 51.30 Hours <br />_________ _____________ <br />Unit cos[ $0.11] /LCY Total ]ob cost $6,595.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.