Laserfiche WebLink
<br /> <br />RECLAMATION COST SUNPMRY cont'd sheet 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost I$) <br />Subtotal IH): <br />____________ <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost 1$1 <br />Subtotal II): <br />J. EARTHWORK <br />Task No.~ <br />7 <br />TOPSOIL/SUBSOIL REPLACEMENT <br />Task Description <br />Replace Topsoil Over 35 Acres <br />C09L ($~ <br />$51,106 <br />_________________________ <br />Subtotal IJ): 551.106 <br />