Laserfiche WebLink
<br /> INDIRECT COSTS <br /> Mobilization and Demobilization <br /> (SX of Direct Costs) = S 130,008 <br /> Contingencies <br /> (7X of Direct Costs) = 182,012 <br /> Engineering Redesign Fee <br /> (5.5X of Direct Costs) = 143,010 <br /> Contractor Profit and Overhead <br /> (7.SX of Direct Costs) = 195,012 <br /> Reclamation Management Fee <br /> (4.OX of Dirac[ Costs) = 104,007 <br /> Reclamation Cost Reserve Account <br />(10X of Direct Costs) - <br />260 <br />017 <br /> , <br /> TOTAL INDIRECT COSTS = 51,014,066 <br /> i OTAL RECLAMATION LIABILITY = 53,614,231 <br /> a <br /> ([NERD = 53,753,587) <br />CMLRD calculated the minimum acceptable bond et 53,753,587. This does not include a <br />Reclamation Cost Reserve Account. Peabody proposes to include a reserve account of <br />E246,413, bringing the total bond amount to f4,000,000. As of this date (8/27/91), the <br />reclamation bond calculations have not been changed to agree with LMLRD's calculations. <br />• <br />13 Revised 08/27/91 <br />