Laserfiche WebLink
<br />~~ INDIRECT COSTS <br /> Mobilization and Demobilization <br /> (SX of Direct Costs) = S 130,008 <br /> Contingencies <br /> (7X of Direct Costs) = 182,012 <br /> Engineering Redesign Fee <br /> (5.5X of Direet Costs) = 163,010 <br /> Contractor Profit and Overhead <br /> (7.SX of Direct Costs) = 195,012 <br /> Reclamation Management Fee <br /> (4.OX of Direct Costs) = 704,007 <br /> Reclamation Cost Reserve Account <br />(10X of Direct Costs) _ <br />260 <br />017 <br /> , <br /> TOTAL INDIRECT COSTS = (1,014,066 <br /> TOTAL RE CI AMpTION LIABILITY = E3,614,231 <br /> a <br /> (CM LRD = f3, 753,587) <br />CNLRD calculated the minimum acceptable bond et f3, 753,587. This does not include a <br />Reclamation Cost Reserve Account. Peabody proposes to include a reserve account of <br />(246,413, bringing the total bond amount [o f4,000,000. As of this date (8/27/91), the <br />reclamation bond calculations have not been changed to agree with CNLRD~s calculations. <br />• <br />13 Revisetl 08/27/91 <br />