My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09496
DRMS
>
Back File Migration
>
Revision
>
REV09496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:59 AM
Creation date
11/21/2007 10:04:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
9/19/1991
Doc Name
SENECA II-W MINE PN C-82-057 PR1
From
PEABODY COAL CO
To
BLM
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~ INDIRECT COSTS <br /> Mobilization and Demobilization <br /> (SX of Direct Costs) = S 130,008 <br /> Contingencies <br /> (7X of Direct Costs) = 182,012 <br /> Engineering Redesign Fee <br /> (5.5X of Direet Costs) = 163,010 <br /> Contractor Profit and Overhead <br /> (7.SX of Direct Costs) = 195,012 <br /> Reclamation Management Fee <br /> (4.OX of Direct Costs) = 704,007 <br /> Reclamation Cost Reserve Account <br />(10X of Direct Costs) _ <br />260 <br />017 <br /> , <br /> TOTAL INDIRECT COSTS = (1,014,066 <br /> TOTAL RE CI AMpTION LIABILITY = E3,614,231 <br /> a <br /> (CM LRD = f3, 753,587) <br />CNLRD calculated the minimum acceptable bond et f3, 753,587. This does not include a <br />Reclamation Cost Reserve Account. Peabody proposes to include a reserve account of <br />(246,413, bringing the total bond amount [o f4,000,000. As of this date (8/27/91), the <br />reclamation bond calculations have not been changed to agree with CNLRD~s calculations. <br />• <br />13 Revisetl 08/27/91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.