Laserfiche WebLink
<br /> <br /> <br />• <br />INDIRECT COSTS <br />Mobilization and Demobilization <br />(SX of Direct Costs) = s 130,008 <br />Contingencies <br />(7X of Direct Costs) = 182,012 <br />Engineering Redesign Fee <br />(S.SX of Direct Costs) = 143,070 <br />Contractor Profit and Overhead <br />(7.SX of Direct Costs) = 795,072 <br />Reclamation Management Fee <br />(4.OX of Direct Costs) = 104,007 <br />Reclamation Cost Reserve Attount <br />(10X of Direct Costs) = 260,077 <br />TOTAL INDIRECT COSTS 21,014,066 <br />TOTAL RECLAMATION LABILITY = 53,614,231 <br /> e <br /> (CNLRD = 53,753,587) <br />CNLRD calculated the minimum acceptable bond at 53,753,587. This does not include a <br />Reclamation Cost Reserve Account. Peabody proposes to include a reserve account of <br />5246,413, bringing the total bond amount to 54,000,000. As of this date (8/27/91), the <br />reclamation bond calculations have not been changed [o agree with CMLRD's calculations. <br />13 <br />Revised 08/27/91 <br />