Laserfiche WebLink
SETTLEMENT AGREEMENT JUSTIFICATION <br />NOV C-94-018 <br />Notice of Violation C-94-018 was issued for "Failure to pass <br />disturbed area drainage through a sediment pond or treatment <br />facility". Joe Dudash issued the NOV to Basin Resources, Inc. on <br />August 12, 1994 at the New Elk Mine. Mr. Dudash described four <br />areas of the mine that were in violation. They were: <br />1) The western portion of western most coal stockpile. A <br />road berm had been constructed which directed disturbed area <br />drainage to a clean water ditch instead of through the <br />intended mine ditch and into the pond. There was no <br />evidence of damage. <br />2) There was approximately ~ cubic foot of coal on the <br />south bank of the Purgatoire River, north of the prep plant <br />beneath the conveyor belt. A box structure built to catch <br />coal fines had split at the seams allowing some fines to <br />escape. This was repaired by the end of the inspection. <br />3) A small area east of the coal silo was not graded <br />properly allowing drainage to go offsite. There was <br />evidence of a small amount of offsite flow, along the <br />railroad tracks, although there was no flow at the time of <br />the inspection. The operator installed some hay bales to <br />prevent water from going off-site. <br />4) Water had displaced some of the rocks in the reno <br />mattress on the west side of the refuse disposal area (RDA). <br />There was evidence that water had flowed off site and into <br />the ditch along State Highway 12. This had been repaired. <br />Mr. Ralph Lopez, representing Basin Resources Inc., contested the <br />fact of the violation. He stated that a storm, greater than the <br />10-year, 24-hour storm event, had occurred on the mine site <br />August 3, 1994. As required by the Regulations all the <br />structures were designed and built to handle flow from a l0-year, <br />24-hour event, except for the reno mattress which was designed <br />for the 100-year event. <br />The normal summer precipitation is 2.2" at the New Elk Mine. On <br />August 3, 1994, 2.99" of rain fell, 2.6" of which fell in a four <br />hour period. The 10-year, 24-hour event is 2.9". To compound <br />matters, 3-4" of rain fell in July so the sediment control system <br />had already been heavily used and was undergoing maintenance. <br />The intense, rapid rain on August 3 contributed to each of the <br />problems. <br />Mr. Lopez went on to describe the extent of damage caused by the <br />failure of these structures. At the coal stockpile, 0.4 acres <br />would have gone untreated. At the second area, 0.003 acres were <br />disturbed by the coal fines that seeped under and through the <br />