My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-09_REVISION - M2005045
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005045
>
2007-03-09_REVISION - M2005045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:43:09 PM
Creation date
11/21/2007 10:04:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005045
IBM Index Class Name
Revision
Doc Date
3/9/2007
Doc Name
Access Road Approval
From
DRMS-acs
To
DRMS-kap
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />PelTnit #: M2005045 Confidential?: NO <br />Class: Type-Seq.: AM-O1 <br />From: DBMS-acs To: DBMS-kap <br />Doc. Name: Access Road Approval <br />Doc. Date: 3-9-2007 <br />Specialist: ACS, KAP <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />-&- <br />SAFETY <br />DATE: March 9, 2007 <br />TO: Kate Pickford <br />FROM: Allen Sorenson I ~, <br />RE: Approval of Proposed Access Road, Rock Dog No. 1 Pit, <br />Gravel LLC, File No. M-2005-045 <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cottony <br />Division Director <br />Natural Resource Trustee <br />The Division of Reclamation, Mining, and Safety (DBMS) engineering staff have reviewed the <br />following information: <br />Florida River Parkway -Improvement Plans, prepared by Goff Engineering and Surveying, <br />Inc., and dated December 18, 2006; <br />Geotechnical Engineering Slope Stability Analysis for Airport Business Park Access Roadway <br />Project Site, prepared by Trautner Geotech, and dated November 20, 2006; <br />Geotechnical Engineering Clarifications, letter report prepared by Trautner Geotech, and dated <br />November 29, 2006. <br />The road plans described and contained in these documents are acceptable to the DBMS. In fact, these <br />plans contain more detail and certain upgrades to the plans DBMS previously accepted. Because the <br />road to be constructed crosses a steep slope, and because there will be numerous on-the-ground <br />engineering decisions to be made during construction, the Operator must provided the DBMS with a <br />general schedule for road construction so that inspections of the work can be scheduled. <br />cc: Tony Waldron, DBMS (via email) <br />Cazl Mount, DBMS (via email) <br />rlacs filesUly Documents 4-19-06 [hmtrock dog access road approval memo.doc <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.