Laserfiche WebLink
<br />Cresson Project <br />Reclamation Cost <br />Area: New Metallurgical Laboratory <br />Demolition do Disposal <br /> <br />s <br />Building Length Width Peak Eave Cu.Ft. S/Cu.Ft. Cost <br />Laboratory Building 140.0 50.0 21.2 16.0 130200 0.17 22134 <br />Loading Dock 40.0 20.0 13.9 11120 0.17 1890 <br />Baghouse #1 21.0 17.5 12.0 4410 0.17 750 <br />Baghouse #2 8.0 23.0 12.0 2206 0.17 375 <br />Total Demolition 25149 <br />x R.S. Means, Building Construction Cost Data, pg 30, 1997. <br />