My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21969
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:50 PM
Creation date
11/21/2007 10:04:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
5/13/1985
Doc Name
May 8 INSPECTION
From
MLRD
To
WEST ELK COAL CO
Violation No.
CV1985036
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~pF ~CO~? <br />e Y`"~`-X~ yO <br />~;~~, <br />~, o DEPARTMENT OF NATURAL RESOURCES <br />f ~ ~1 p ~~ * Davitl H Getches, Eaeculive Duector <br />* ~g 6 * DAVID C. SHELTO N, Director <br />Richartl D. Lamm COAL INSPECTION REPORT ~ ~' <br />Governor <br />~~ <br />Operation: MT. GUNNISON N0. 1 MINE <br />File No.: C-007-80 <br />Operator Name: lJest Elk Coal Company <br />Perinittee Name: Saine <br />Address: P. 0. Box 591 <br />Somerset, Colorado 81434 <br />County: Gunnison <br />Inspection Date: play 8, 1985 <br />Type of Operation: Underground, federal <br />Inspector: Susan i•1owry, Randy Price <br />:Jeatiier: Sunny, warm <br />Tiine: 1:30 - 4:00 p.m. <br />Type of Inspection: Complete <br />Operator Contact: Jim Langston <br />I. General Comments <br />Gob had been pushed or slid onto an area where topsoil had not been stripped <br />on the south side of the laydown gob pile. NOr! C-85-036 was issued for <br />failure to protect soil resources. <br />~`ay <br />.y <br />The sediment ponds below the gob pile and below the Bear overburden stockpile <br />were both very full with water. These ponds should be watchad carefclly for <br />proper handling of contained water. <br />Drainage on the portal bench is being properly handled. A few modifications <br />in ttre drainage system are planned by the operator. Kline water continues to <br />be piped down the bench outslope to the road ditch. <br />Gob material is being cleaned up from east of the portals. A small amount of <br />coal has been stockpiled on the portal bench. <br />Construction of the bin wall behind the substation is progressing. Seine <br />topsoil remains to be salvaged east of the substation. <br />q dit hes, n~{ lvert a eared t b in pod cqn ition <br />~~~ l,enrtennia~ gui~dring, 133 ~Perman 5~reeof D~nver, C.o oraclo SOe03 T al. {303) SEr-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.