Laserfiche WebLink
sT~T~ of co~o~o <br />DIVISION OF MINERALS AND GEOLOGY <br />oewn~ d wwral Resources RECEIVE <br />J 13 y,en,,,n sr., Rnom Z ~ 5 <br />oEn.er. cdnr~do eo2o7 FEB 2 2 1! <br />vhane. 0071 e66-3567 APPLICATION FORM FOR A REVISION <br />FAX. 1703) 932-8706 <br />TO A COAL MINING AND RECLAMATION ~Eot Ivunerals ~ <br />This form must be completed and submitted with all requests for minor revisions, as defined in ~~ <br />Rules t .Oa(731, technical revisions, as defined in Rule 1.0411361, and permit revisions: as defined ~"a <br />in Rule 1.04(901. All revisions ors to address the requirements of Rule 2.08.4. Three (31 copies y~.srom6s.d <br />of the revision, inducting maps, must be submitted in order for it to be complete. 6evi°1eD"L°r <br />rndrel0.ls{ <br />All revisions are to be formatted so they can be insetted into the permit to replace the revised o,.r+~.o.eow. <br />sections, maps, tables and/or figures, with a revised table of contents, if mscessary. The revision <br />submittal date should be printed in the lower dgM corner of each revision page. A Dover fetter to the . <br />revision should explain the nature Of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on th9 federal maifutg <br />list at the same time the app/"nation is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of drstribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Alhuquerque Field Office <br />(AFOt, and proof of submittal to AFO must be submitted to the Division prior to implementation of the <br />revision. <br />Permit No.: C-~ 1- O 2 +j Date: O Z! Z o l d S <br />Permittee: ~ g i ~ ~ r - ~ g ~ sL ~ ~ L ~ 5l <br />Street: ~~ D _-~~~-~Z--__ <br />- - - - - - - - - - - - - - - <br />State: G ~ Zip Cade: ~ ~ Z 3 ~ - _ - - _ <br />Brief Description of Revision: ~ ~ ~ ~ ~ _ ~ g ~L. - ^E- - _ <br />V --~ ~ ~ -r -S'' - - - - - - - - <br />Public Notice AttacAed: Yes - No X lRequ/red !or PRs and TRsJ <br />Bond Increase: Yes - No ZC Federal _ Non-Federal ~C Mine <br />Proposed Change in: <br />Disturbed Area t + /-1 _ - Q . _ Acres Affected Area l +/-1 _ _ O . _ Acres <br />Permit Area (+1-) _ _ O . _ Acres Federal Land l+/-) _ _ O . _ Acres <br />State land (+/-) _ _ d . _ Acres Private Land (+!-) _ _ ~ _ Acres <br />m:\cnd\s~~rNrorms\6aeS <br />