My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2007-08-31_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:24 PM
Creation date
11/21/2007 10:03:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
8/31/2007
Doc Name
TR-09, Submittal
From
Cemex
To
DRMS
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-PIT Hydrogeologic Investigations <br />Technical Revision No, 8 <br />1: Introduction Mining Permit M-1977-208 <br />1.2 Project Approach <br />CEMEX outlined the project approach and scope ut its March 30, 2007 proposal for TR-8, which included <br />the following elements: <br />• Compile available historical and operational information for the Boulder Feeder Canal, the Swede Ditch, <br />and the Highland Ditch in the area of the CEMEX Lyons facility. <br />• Conduct a comprehensive site visit to confirm area geology, ditch flow gauging station locations, <br />piezometer and well locations. <br />• Investigate ditch seepage losses through gauging. <br />• Install piezometers and monitoring wells at multiple units/depths. <br />• Install a compliance well in the Fort Havs Limestone unit dow-ngradient of C-Pit and the existing <br />monitoring well CEM-001. <br />• Conduct groundwater sampling for chemical analysis at those locations where groundwater is located and <br />may be sampled. <br />• Prepare a report summarizing the results of the investigations. <br />One task in the original TR-8 proposal, testing the integrity of the A-Pit water hne during the next scheduled <br />plant shut down, was not completed. This was due to an earlier shut down of the plant than had been <br />anticipated Qune rather than]uly), and an accelerated restart schedule (one week) that did not provide <br />sufficient time to test the A-Pit water line to the spray tower. The next scheduled plant shut down is for <br />January 2008, and at that time CEMEX will consider if circumstances warrant testing of the A-Pit hne. <br />' 1.3 Report Organization <br />The organization of this C-Pit TR-8 Hydxogeologic Investigations report is as follows: <br />• Section 1 -Introduction consisting of a general project summary, including project objectives, project <br />approach, and report organization. <br />• Section 2 -Site Analysis and Field Activities describes the review of historical aerial photographs and <br />relevant records, and field investigation methods and activities. <br />• Section 3 -Observations and Results describes the groundwater and surface water sampling results as well <br />as relevant hydrogeologic observations made during the investigations. <br />• Section 4 -Conclusions presents an overall assessmen[ of environmental data and CE.'vIEX's conceptual <br />model for the Site. <br />• Section 5 -Recommendations outlines CEMEX's proposed long-term sampling program as Technical <br />Revision No. 9 to permit number M-1977-208. <br />1-2 <br />Use of conlenis on this sheet i5 Sub~ecl to the limitations spemfied at ChB end OI this document <br />\1BCOEN02~pro~ects\Deta~GENtCemex\TR~~Reporting~GEMEX Reporl08-3b07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.